Danfoss DLX 4.6 Podręcznik Użytkownika Strona 41

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 40
User Guide DLX Series L00410623-1 41
If the inverter is set to master, data must be collected from the follower inverters. The
following screen is displayed:
7. Grid Configuration
Enter – Call up the list of grid configurations
Up or Down Select the grid configuration of
the actual installation site:
TN/TT, IT, Undefined
Enter – Confirm
Left – Back
Right – Next
Enter – Confirm
8. Feeding Phase
Enter – Call up the list of phases
Up or Down Select the preferred phase:
- If configured for TN/TT: Not set, L1, L2, L3
- If configured for IT: Not set, L1-L2, L1-L3, L2-L3
EnterConfirm
Left – Back
Right – Next
Enter – Confirm
If the inverter is set to master, and there is more than one inverter in the plant, the
following screen is displayed:
Przeglądanie stron 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 85 86

Komentarze do niniejszej Instrukcji

Brak uwag