
User Guide DLX Series L00410623-1 51
5.3.4. Finish
After the test is successfully finalized, the test results are displayed.
Enter Next to confirm each result, and enter Finish on the last result to finalize the test.
1. 2.
3. 4.
• After successfully finalization of the test, the inverter goes back to the Inverter Command
menu.
• The test results are stored in Commands > Inverter Commands > Results Self Test.
• If the test fails more than 3 times, contact Danfoss.
Komentarze do niniejszej Instrukcji